91. Single units work such as doors and windows are expressed in

a. numbers

b. meters

c. m2

d. m3

92. Work consisting of linear measurements like fencing which involve lengths is measured in

a. m3

b. Kilograms

c. Running metres

d. m2

93. Works like whitewashing and plastering are measured  in

a. m2

b. m3

c. Metres

d. Litres

94. Works like earthwork and cement concrete are measured in

a. Square metres

b. Cubic metres

c. Litres

d. None of above


95. Unit of measurement for damp proof course is

a. kg

b. cum

c. sqm

d. number

96. Unit of measurement of iron holdfasts in steelwork is

a. kg

b. cum

c. Quintal

d. number

97. The unit of measurement of pointing, painting and varnishing (no. of coats specified) is cum.

a. True

b. False

98. Unit of measurement asbestos cement sheet roofing is

a. kg

b. cum

c. sqm

d. number

99. The unit of measurement of pointing, painting and varnishing (no. of coats specified) is sqm. The unit of payment is per sqm.

a. True

b. False


100. Unit of measurement of rainwater pipe is

a. Litres

b. Cum

c. Number

d. Running metres

101. The rules for measurement of all items are described in a. IS - 1999

b. IS - 1968

c. IS - 1948

d. IS - 1200

102. As  per the rules for measurement of items,  it is specified that areas should be measured  to the nearest

a. 0.01 sq m

b. 0.1 sq m

c. 0.25 sq m

d. 0.85 sq m

103. Which of the following data is not required to prepare an estimate?

a. Rates

b. Drawing

c. Amplitude

d. Specifications

104. The rules for measurement of all items are described in IS-1200. It is specified that in booking, the order should be in sequence of length, breadth and height.

a. True

b. False

105. The unit of payment of cement concrete in lintels is

a. Per sqm

b. Per cum

c. Quintal

d. None of the above

106. Calculate the number of cement bags required for RCC (1:2:4) for 15 m3 of work.

a. 87.3

b. 98.3

c. 93.8

d. 38.9

107. The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is

a. 15.32 m2

b. 18.24 m2

c. 45.22 m2

d. 44.58 m2

108. The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is

a. 5.32 m2

b. 6.51 m2

c. 5.22 m2

d. 4.58 m2


109. Calculate the number of cement bags required for 2500 kg of cement.

a. 200

b. 100

c. 50

d. 500

110. The rates of materials used for government works are approved by

a. SDO

b. Elective board

c. Board of chief engineers

d. Executive board

a. True

b. False

112. Which of the following is the correct order of stages of estimation of concrete roads?

a. Earthwork excavations, cement concrete for wearing course (1:4:8) and cement concrete for the base course (1:2:8)

b. Earthwork excavations, cement concrete for the base course (1:4:8) and cement concrete for wearing course (1:2:8)

c. Earthwork excavations, cement concrete for the base course (1:6:9) and cement concrete for wearing course (1:7:9)

d. Cement concrete for the base course (1:2:3), cement concrete for wearing course (2:7:9) and earthwork excavations

113. The unit of payment of cement concrete in lintels is per cum. The unit of payment of R.C.C. in the slab is also per cum. Here, per cum stands for per cubic metre.

a. False

b. True

114. The weight of one cement bag is 50 kg. Therefore, the number of cement bags required for 2500 kg of cement is 2500/50 i.e. 50 bags.

a. True

b. False

115. The concrete used for cement concrete roads is of grade

a. M 10

b. M 15

c. M 20

d. M 25

116.Which of the following is not a classification of labour?

a. skilled first class

b. unskilled fourth class

c. skilled second class

d. skilled

117. The unit of measurement is per quintal for the folloing :

a. Well facing

b. Expanded metal wire netting

c. M.S. reinforcement of R.C.C. works

d. Rolling shutters


118. The measurement is not made in square metres in case of

a. R.C. Chhajja

b. D.P.C

c. Form works

d. None of above

119. The measurement is made in square metre in case of

a. Cement concrete in foundation

b. Hollow concrete block wall

c. R.C.C structure

d. None of above

120. The brick work is measured in sq metre, in case of

a. Half brick walls or the partition

b. Brick flat soling

c. Honey comb brick work

d. All of above